Implementing Innovative Strategies for Sustainable Infrastructure Development in Soft Soil Conditions: A Case Study in Kalimantan
DOI:
https://doi.org/10.20527/bpi.v9i1.310Keywords:
innovative strategy, risk management, soft soil, sustainable infrastructureAbstract
Infrastructure development on soft soil conditions in Kalimantan faces major challenges, including low soil bearing capacity, high technical risks, and construction cost overruns. These conditions require adaptive technical solutions combined with effective management strategies to ensure sustainable project delivery. This study examines an innovative approach integrating risk management, value engineering (VE), and Hydraulic Static Pile Driver (HSPD) technology to enhance cost and time performance in soft soil infrastructure projects. A case study was conducted on the construction of the Kapuas District Head Office Hall in Central Kalimantan, which utilized 30 × 30 cm minipile foundations installed to a depth of 24 meters using an 80-ton HSPD system. A descriptive-comparative analysis was applied through four stages: project risk assessment using a probability–impact matrix; cost analysis based on changes in the Cost Budget Plan (RAB); evaluation of HSPD performance compared to conventional hammer piling; and application of value engineering through function-to-cost ratio analysis. The results indicate that the integrated strategy achieved approximately 11% cost efficiency without compromising construction quality while improving schedule performance. The findings demonstrate that combining technological innovation and structured management strategies supports sustainable infrastructure development in soft soil regions of Kalimantan.References
Abdel-Razek, S. A., Barakat, H. A. R., & Ibrahim, S. M. S. Z. (2024). Universal and inclusive design in public open spaces for wellbeing-oriented cities: Design strategies for the case of Alexandria public beach. International Journal of Sustainable Development and Planning, 19(6), 2037–2049. https://doi.org/10.18280/ijsdp.190604
Abusafiya, H. A. M., & Suliman, S. A. M. (2017). Causes and effects of cost overrun on construction project in Bahrain: Part 2 (PLS-SEM path modelling). Modern Applied Science, 11(7), 28–41. https://doi.org/10.5539/mas.v11n7p28
Afolabi, B. A., Abiola, M. O., Kehinde, O. R., Omoyajowo, M. O., Ajayi, O. A., & Jinad, O. (2024). Environmental sustainability of pile construction activities in Nigeria: Strategies and best practices. British Journal of Multidisciplinary and Advanced Studies, 5(5), 1–18. https://doi.org/10.37745/bjmas.2022.04168
Amanda, M. I., Febrianty, R., & Rahman, T. A. (2018). Tinjauan perhitungan bangunan bawah (sub structure) proyek jembatan Sungai Jinal. Jurnal Kacapuri: Jurnal Keilmuan Teknik Sipil, 1(1), 7–15. https://doi.org/10.31602/jk.v1i1.1433
Azis, A. A. A., Memon, A. H., Rahman, I. A., & Abd Karim, A. T. (2013). Controlling cost overrun factors in construction projects in Malaysia. Research Journal of Applied Sciences, Engineering and Technology, 5(8), 2621–2629. https://doi.org/10.19026/rjaset.5.4706
Bryde, D., Broquetas, M., & Volm, J. M. (2013). The project benefits of building information modelling (BIM). International Journal of Project Management, 31(7), 971–980. https://doi.org/10.1016/j.ijproman.2012.12.001
Cantarelli, C. C., Flyvbjerg, B., Molin, E. J. E., & van Wee, B. (2010). Cost overruns in large-scale transportation infrastructure projects. European Journal of Transport and Infrastructure Research, 10(1), 5–18. https://doi.org/10.18757/ejtir.2010.10.1.2864
Creedy, G. D., Skitmore, M., & Wong, J. K. W. (2010). Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. Journal of Construction Engineering and Management, 136(5), 528–537. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000160
Datta, S. D., Tayeh, B. A., Hakeem, I. Y., & Abu Aisheh, Y. I. (2023). Benefits and barriers of implementing building information modeling techniques for sustainable practices in the construction industry. Sustainability, 15(16). https://doi.org/10.3390/su151612466
Eliasson, J. (2025). Cost overruns of infrastructure projects – Distributions, causes and remedies. Transportation Research Part A: Policy and Practice, 198, 104532. https://doi.org/10.1016/j.tra.2025.104532
Febrianty, R., Wibowo, M. A., Utomo, J., & Hatmoko, D. (2025). The strategy of knowledge transfer in the rehabilitation project of Immanuel Church (Bleduk), Semarang City. Livas, 10(1), 47–61. https://doi.org/10.251005/livas.v10.22594
Gouda Mohamed, A., Alqahtani, F. K., Ismail, E. R., & Nabawy, M. (2024). Synergizing BIM and value engineering in the construction of residential projects. Buildings, 14(8). https://doi.org/10.3390/buildings14082515
Indraratna, B., Rujikiatkamjorn, C., Balasubramaniam, A. S., & McIntosh, G. (2012). Soft ground improvement via vertical drains and vacuum assisted preloading. Geotextiles and Geomembranes, 30, 16–23. https://doi.org/10.1016/j.geotexmem.2011.01.004
Ishihara, Y. (2018). Use of press-in piling data for automatic operation of press-in machines and estimation of subsurface information. In Proceedings of the First International Conference on Press-in Engineering (pp. 651–660).
Kazemi, M. Z., Elamer, A. A., Theodosopoulos, G., & Khatib, S. F. A. (2023). Reinvigorating research on sustainability reporting in the construction industry. Journal of Business Research, 167, 114145. https://doi.org/10.1016/j.jbusres.2023.114145
Kolay, P. K., & Rahman, M. A. (2016). Physico-geotechnical properties of peat and its stabilisation. Ground Improvement, 169(3), 206–216. https://doi.org/10.1680/jgrim.15.00025
Lendra, L., Jesica, J., & Febrianty, R. (2025). Impact of green building implementation on health and well-being of building users in Indonesia. Jurnal Presipitasi, 22(1), 1–14. https://doi.org/10.14710/presipitasi.v22i1.1-14
Lu, W., Fung, A., Peng, Y., Liang, C., & Rowlinson, S. (2014). Cost-benefit analysis of BIM implementation in building projects. Building and Environment, 82, 317–327. https://doi.org/10.1016/j.buildenv.2014.08.030
Mansfield, N. R., Ugwu, O. O., & Doran, T. (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management, 12(4), 254–260. https://doi.org/10.1016/0263-7863(94)90050-7
Mesri, G., & Ajlouni, M. (2007). Engineering properties of fibrous peats. Journal of Geotechnical and Geoenvironmental Engineering, 133(7), 850–866. https://doi.org/10.1061/(ASCE)1090-0241(2007)133:7(850)
Mohamad, H. M., Zainorabidin, A., Musta, B., Mustafa, M. N., Amaludin, A. E., & Abdurahman, M. N. (2021). Compressibility behaviour and engineering properties of North Borneo peat soil. Eurasian Journal of Soil Science, 10(3), 259–268. https://doi.org/10.18393/ejss.930620
Page, S. E., Rieley, J. O., & Banks, C. J. (2011). Global and regional importance of the tropical peatland carbon pool. Global Change Biology, 17(2), 798–818. https://doi.org/10.1111/j.1365-2486.2010.02279.x
SAVE International. (2015). Value standard and body of knowledge. SAVE International.
Shen, Q., & Liu, G. (2003). Critical success factors for knowledge management studies in construction. Journal of Construction Engineering and Management, 129, 485–491.
van Wee, B. (2007). Large infrastructure projects: A review of demand forecasts and cost estimations. Environment and Planning B, 34(4), 611–625. https://doi.org/10.1068/b32110
Wang, K., Guo, M., Di Sarno, L., & Sun, Y. (2024). Decoding BIM adoption: A meta-analysis. Buildings, 14(920). https://doi.org/10.3390/buildings14040920
Wani, K. M. N. S., & Mir, B. A. (2019). Effect of biological cementation on the mechanical behaviour of dredged soils. International Journal of Geosynthetics and Ground Engineering, 5(4). https://doi.org/10.1007/s40891-019-0183-9
Wao, J. (2015). A review of the value engineering methodology: Limitations and solutions for sustainable construction. In SAVE Value Summit 2015.
White, D., Finlay, T., Bolton, M., & Bearss, G. (2002). Press-in piling: Ground vibration and noise during pile installation. In International Deep Foundations Congress (pp. 363–371).
Whitlock, K., Abanda, F. H., Manjia, M. B., Pettang, C., & Nkeng, G. E. (2021). 4D BIM for construction logistics management. CivilEng, 2(2), 325–348. https://doi.org/10.3390/civileng2020018
Xie, W., Deng, B., Yin, Y., Lv, X., & Deng, Z. (2022). Critical factors influencing cost overrun in construction projects. Buildings, 12(11). https://doi.org/10.3390/buildings12112028
Warren, M., Hergoualc’h, K., Kauffman, J. B., Murdiyarso, D., & Kolka, R. (2017). An appraisal of Indonesia’s immense peat carbon stock. Carbon Balance and Management, 12(1). https://doi.org/10.1186/s13021-017-0080-2
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Ruliana Febrianty, Sumiyanto

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.